Keep parallel costs in the plan
Include the period when both environments run, plus infrastructure, backup and third-party licenses.
Install Neverinstall Private Cloud alongside vSphere. Test one workload group, measure its downtime and rehearse rollback before you approve the production move.
VMware Cloud Foundation is sold per core as a subscription bundle. Moving everything before the renewal means one cutover with no tested way back.
We read your vCenter inventory and map dependencies with your team. Send your host list and renewal quote for a written sizing, migration and pricing report. You approve each workload group’s cutover and recovery plan.
vSphereExisting environment
Neverinstall Private CloudInstalled alongside
Per node, quoted for the workloads in scope
On supported servers alongside vSphere
Tested for each workload group, including data written after cutover
A cutover window measured in the pilot
Include the period when both environments run, plus infrastructure, backup and third-party licenses.
Application owners approve service behavior. Infrastructure owners approve cutover and recovery. Neverinstall engineers help map and test the first group.
Review Virtual Machines, application dependencies, storage, networks and backups. Identify the hosts your contract allows you to remove from renewal.
Set up a pilot cluster on supported servers. Keep vSphere and the tools you still depend on running.
Import the Virtual Machines and map networks and storage. Test applications, guest drivers, backups and restore. Measure downtime and rehearse rollback, including new data.
Keep source Virtual Machines powered off until sign-off, then move the next group.
| VMware Cloud Foundation | Neverinstall | |
|---|---|---|
| Licensing unit | Per CPU core, as a subscription bundle | Per node, quoted for your deployment |
| What your team operates | ESXi, vCenter, vSAN and NSX, updated through the VCF lifecycle tools | Compute, storage and networking, installed and upgraded together |
Compared with VMware Cloud Foundation 9, checked September 2026. Licensing terms vary by agreement; check your current quote.
It depends on the agreement. Hosts leave the renewal only where your terms allow it. Compare a per-node quote for the same workloads, including parallel operation, infrastructure and third-party licenses.
The migration pipeline reads vCenter inventory, imports VMDK and VHDX disks and prepares VirtIO drivers. We map port groups and firewall rules to Tenant Networks, Subnets and Security Groups, then test them with the first group.
Neverinstall Private Cloud installs alongside vSphere in about 30 minutes, and most teams have a first cluster running in a day. The first workload group moves once its pilot tests pass.
We measure a window for each workload group during the pilot. The duration depends on the application and replication method. Live migration from vSphere is on the roadmap.
We write and test a rollback plan for each workload group. The original Virtual Machines remain powered off in vCenter until sign-off. The plan includes a return step for data written after cutover.
Yes. Veeam is supported alongside built-in scheduled backups to an off-cluster vault. The pilot backs up and restores a migrated Virtual Machine before a production move.
Send your host list, application dependencies and renewal quote.